Wet Weather Groundwater Testing Period Now Open

The District has now received a cumulative annual rainfall of 15 inches.  Per Section 4.12.100 of the District's Title IV - Onsite Wastewater Management Code, the Wet Weather Groundwater Testing Period has now started and shall close on May 31, 2026.

Wet weather groundwater testing shall consist of a first set of groundwater depth measurements taken within 48 hours following an accumulated rainfall of at least 0.5 inches in a consecutive 48-hour period, and a second set of groundwater depth measurements shall be taken within 24 hours of the first. All groundwater depth measurements shall be taken from each monitoring well, by the Designer only. Results of the groundwater depth determination shall be presented in a summary report, stamped and sealed by the Designer, clearly indicating the results found.

Posted in